Skip to content
Unique Engineers.

What we do

HVAC & Mechanical.

Cooling, heating and ventilation for buildings, cleanrooms and industrial processes.

43
HVAC projects in the register
29
Controlled HVAC method statements
Built and maintained under engineer review
13.5 km
Chilled water piping at Digital Edge BOM131
From 25 to 450 mm, with actuated valves, balancing and instruments
22
Free issue chillers installed at AdaniConneX HYD 23
With 60 fan wall units and 72 precision AHUs

Our scope

What we deliver.

HVAC is where the company began, and it is the largest service line by projects in the register.

01

Chilled water plants and cooling towers

02

AHUs, FCUs and VRF

03

Ventilation and smoke control

04

Pumps, piping and hydronics

05

Precision and process cooling

By industry

The same trade, engineered for each kind of facility.

Data centres

Cooling plant and hydronics

Chillers and cooling towers, primary and secondary pumping, N+1 and 2N distribution, thermal energy storage, PICV balancing, sectional isolation and cross ties for concurrent maintainability.

Data centres

Precision cooling and white space

CRAH and PAC units, in row cooling, aisle containment, rear door heat exchangers, liquid cooling ready paths with CDU integration, zoned leak detection.

Industrial

Industrial HVAC

Cooling plants, pumps, AHUs, ventilation, exhaust, ducts and hydronic distribution. Temperature and humidity control for manufacturing and support areas.

Cleanrooms

Cleanroom HVAC

Make up air units, recirculation AHUs, fan filter units and HEPA terminal filtration, sized room by room to hold the ISO class, temperature and humidity.

Cleanrooms

Pressure and airflow

Pressure differentials between zones, airlocks and anterooms, unidirectional or turbulent airflow set per room, and low level returns.

Public and institutional

Central HVAC plants

High efficiency chiller plants, thermal storage and air distribution sized for large campuses and office complexes.

Public and institutional

Low energy systems

Thermal energy storage, geothermal water cooled VRV, brine chillers and evaporative cooling, as delivered at Nalanda University.

Residential

VRV air conditioning

Supply, installation, testing and commissioning of VRV air conditioning and air purification for residences, tested and commissioned apartment by apartment before handover.

Explore the systems

A closer look.

Central plant: chillers, cooling towers, primary distribution, thermal storage and the hydronic backbone that feeds every air side device.

Explore High Side

On our projects

HVAC scope across our projects.

The scope we hold for this service on each project, as stated in its scope of work.

Data centres

CtrlS DC6 and 7Mahape, Navi Mumbai

Chilled water rings for PAHUs, fan walls and liquid cooling CDU interfaces. Ventilation for battery, transformer and CSS rooms. VRF for support areas, hot aisle containment, DX dehumidifiers and modular supports.

CtrlS HYD 141Chandanvelly, Hyderabad

Chilled water floor and header piping with valves, supports, insulation and cladding. CDU connections for liquid cooling. Industrial DX dehumidifiers for COLP 1 and COLP 2.

About 13.5 km of chilled water piping. Installation of 26 client supplied thermal storage tanks and 26 split case pumps. Fresh air, smoke extraction, dehumidification, ventilation, ductwork and VRF systems.

HYD23 chilled water distribution, AHUs, fresh air, pressurisation, VRF and ventilation. Installation of free issue chillers, fan walls and precision AHUs. Thermal storage, ductwork, insulation and seismic supports.

Anant Raj CloudManesar, Haryana

High side and low side HVAC for Towers D and E. Chiller connections, primary and secondary pumps, chilled water networks, AHUs, fresh air, ventilation, ducts, air terminals and insulation.

STT GDC NMDC01MIDC Mahape, Navi Mumbai

Chilled water distribution and CRAH, PAC, AHU and FCU connections. Valves, ductwork, insulation and air terminals. Ventilation for electrical, UPS and battery rooms, with precision cooling interfaces.

STPI MohaliMohali, Punjab

Three 300 TR chillers, cooling towers and pumping. Chilled, hot and condenser water networks. AHUs, FCUs, VAVs and ventilation. In row precision cooling, UPS room cooling and cold aisle containment.

Semiconductor and industrial

FoxconnDevanahalli, Bengaluru

HVAC, air handling and ventilation for manufacturing and support buildings. Cleanroom mechanical services and coordinated equipment connections within the awarded campus packages.

Chilled water and medium temperature chilled water lines on trestles, with valves, insulation, cladding and pipe supports. The package covers piping and connections.

Air conditioning equipment, AHUs, FCUs and scheduled DX/VRF units. Chilled water piping, ductwork, ventilation, insulation, controls and seismic supports.

Commercial and residential

IKEA / INGKA CentreNoida, Uttar Pradesh

Chiller installation, pumps and chilled water distribution. AHUs, FCUs, fresh air, ventilation, smoke control, ducts, valves and insulation. Equipment supply follows the signed package.

Prestige BKC 101BKC, Mumbai

Chilled water systems, air handling, ventilation and distribution for office and hotel areas. Connections and installation of identified client supplied plant.

World Trade CentreGurugram, Haryana

Chilled water and condenser pumps, cooling towers, AHUs, FCUs and HRUs, GI ducting, chilled water piping, valves, insulation, VSDs and controls.

M3M MansionGurugram, Haryana

Supply, installation, testing and commissioning of VRV air conditioning and air purification for the residences, under separate high side and low side orders.

Public and institutional

Air conditioning, cooling distribution and ventilation for the Common Central Secretariat and Executive Enclave, within the awarded HVAC packages.

HVAC and central chiller plant work in the completed airport reference. Mechanical services coordinated with terminal systems and operational handover.

Nalanda UniversityRajgir, Bihar

Campus HVAC and cooling plant, thermal storage systems and geothermal mechanical interfaces. Installed plant and campus distribution within the completed reference.

HVAC scope as stated for each project. Shares marked illustrative show scope, not contract value, quantities or progress.

DfMA and testing

High fit for off site assembly.

DfMA

Mechanical, high fit

Chilled water spools and headers, pump and CDU skids, valve stations and CRAH connection sets.

Balancing

To ASHRAE, AABC and NEBB procedures

Balancing reports with NABL calibrated instruments, and certificates on record.

Controls

Chiller plant manager

Central control stations and software that sequence the chillers and optimise the plant, as at IKEA, INGKA Centre, Noida.

How we deliver

One method on every project, from kick off to handover.

Seven parts from award to handover, with project controls and HSE and quality running through all of them.

24 hours
Kick off pack
From the kick off meeting to the pack reaching you
3 weeks
Rolling look ahead
Work fronts, labour, material and permits
10 days
Mobilisation
Anywhere in India, and 3 days in the National Capital Region
L1 to L5
Commissioning levels
Each signed off before the next begins
Project controls and monitoringBaseline programme, daily and weekly reports, three week look ahead and monthly review, measured by head office
HSE and qualityMethod statement and risk assessment before every activity, inspection at every stage, audits every two months
Throughout
Part 1 of 7

Kick off

Within 24 hours of the kick off meeting you receive one pack that sets out scope, people, dates and how we will report.

  1. 1

    Award handover

    Sales hands the award to the project team within 24 hours, in one folder.

  2. 2

    Project plan

    Programme, manpower, procurement and drawing plans, approved before anything is released.

  3. 3

    Kick off meeting

    Your team and ours agree scope, interfaces, dates and reporting.

  4. 4

    Kick off pack

    Sent to you within 24 hours of the meeting.

  5. 5

    Weekly targets

    Issued to every team each week from then on.

What you get in the kick off pack

  • Scope and interface matrix

    Who does what at every boundary with other contractors

  • Baseline programme

    Milestones tied to your handover sequence

  • TDS and procurement tracker

    Every submittal and order against its need date

  • Drawing tracker

    Every sheet with its submission and approval status

  • Communication and escalation matrix

    Named contacts, and who to call when something is stuck

  • Organogram and manpower plan

    The site team by name, and labour by trade and month

When

  • 24 hours

    From award to handover inside our team

  • 2 to 3 days

    To prepare the project plan

  • 24 hours

    From the kick off meeting to the pack reaching you

Also in the pack: risk register, HSE plan, quality plan with inspection and test plans, document register, and the bank guarantee and insurance tracker.

Method of working

How the work is controlled on site.

29 controlled methods connect HVAC & Mechanical design intent to work sequence, inspection, testing and handover.

Review the full method index
HV-MS-01HVAC

Hydronic Pipework Fabrication and Pressure Testing

Hydronic Systems

HV-MS-02HVAC

Chemical Cleaning Flushing and Water Treatment

Hydronic Systems

HV-MS-03HVAC

Chilled Water Plant Installation and Start Up

Hydronic Systems

HV-MS-04HVAC

Pump Sets Headers and Hydronic Distribution

Hydronic Systems

HV-MS-05HVAC

Heat Rejection Installation and Commissioning

Hydronic Systems

HV-MS-06HVAC

Plate Heat Exchangers and Energy Transfer Stations

Hydronic Systems

Start a conversation

Let’s discuss your project.

Get in touch