Fire protection
Double interlock pre action sprinklers with nitrogen generation, internal and external hydrants with monitors, high pressure water mist on stainless steel tube, electric, diesel, jockey and booster fire pumps, and extinguishers.
600 MW
Hyderabad
The project
HYD22: fire protection low side works. HYD23: HVAC low side works for a 30 MW build. Both as supply, installation, testing and commissioning, with LOD 400 and LOD 500 shop drawings and as builts, method statements, temporary works, statutory approvals and a 24 month defect liability period.
Project overview
Double interlock pre action sprinklers with nitrogen generation, internal and external hydrants with monitors, high pressure water mist on stainless steel tube, electric, diesel, jockey and booster fire pumps, and extinguishers.
Data hall recirculation and pressurisation units, VRF, ventilation and smoke control, chilled water distribution with motorised valves and BTU meters, ductwork on seismic Zone III supports, ten stratified thermal storage tanks, and installation of 22 free issue chillers, 60 fan wall units and 72 precision AHUs.
Parallel DfMA and non DfMA rates, modular supports and sway bracing with seismic calculations, factory fabrication and commissioning at levels 1 to 5.
HYD23 chilled water distribution, AHUs, fresh air, pressurisation, VRF and ventilation. Installation of free issue chillers, fan walls and precision AHUs. Thermal storage, ductwork, insulation and seismic supports.
MEP totals 95%: HVAC 64%, Electrical 3% and FF 28%. ELV & BMS is 5%. The split illustrates scope; it does not measure contract value, quantities or progress.
Fire protection method statements, modular support details and DfMA pricing prepared for this campus now form part of the standard data centre library.