Unique Engineers.

What we do

Fire & Life Safety.

Detection, suppression and fire protection coordinated with the building and its operations.

14
Fire and life safety projects in the register
About 6,000
Addressable detectors at Prestige BKC 101
With about 2,800 voice evacuation speakers
312
Cause and effect mappings
Proved as one sequence on Prestige BKC 101
NFPA 72
Fire alarm system to UL 864 and NFPA 72
Prestige BKC 101

Our scope

What we deliver.

Detection, suppression and fire protection, coordinated with the building and its operations.

01

Hydrants and sprinklers

02

Fire pumps and pump rooms

03

Fire alarm and public address

04

Clean agent and water mist

05

Fire stopping

By industry

Protection matched to the risk in each facility.

Data centres

Fire and life safety

Very early smoke detection, double interlock pre action sprinklers, clean agent suppression, hydrants, high pressure water mist, foam, fire rated compartmentation.

Industrial

Fire and life safety

Fire water pumps, hydrants, sprinklers, suppression and fire alarm interfaces. Underground ring mains, building networks and protection of service penetrations.

Public and institutional

Fire protection

Hydrants, sprinklers, gas suppression and detection to the National Building Code for offices, terminals and campuses.

Office and hotel

Fire alarm and voice evacuation

Addressable fire alarm and voice evacuation for the office tower and the hotel at Prestige BKC 101, with every life safety interface proved as one sequence.

Explore the systems

A closer look.

Wet and dry riser hydrant systems with electric, diesel and jockey pump sets to NBC 2016 and IS 13039.

Explore Fire Hydrant Systems

On our projects

Firefighting scope across our projects.

The scope we hold for this service on each project, as stated in its scope of work.

Data centres

CtrlS DC6 and 7Mahape, Navi Mumbai

Double interlock pre action sprinklers, cabinets, pipework, valves and heads. Portable fire extinguishers and coordinated fire system interfaces.

CtrlS HYD 141Chandanvelly, Hyderabad

Double interlock pre action sprinklers, cabinets, pipework and valves. Wet sprinklers in lower ground stores. Portable extinguishers and signage.

HYD22 pre action sprinklers, hydrants, ring mains, risers, hose reels and monitors. Water mist system, fire pumps, portable extinguishers and specified foam suppression.

Anant Raj CloudManesar, Haryana

Wet sprinkler networks in MS and GI pipe. Quick response sprinkler heads and flexible drops. Supports, sleeves, firestop sealants and water flow switches.

Semiconductor and industrial

FoxconnDevanahalli, Bengaluru

Firefighting networks, equipment and building interfaces within the campus MEPF work orders.

Underground and aboveground fire lines, hydrants, valves and accessories. The L&T and TPL underground BOQs carry separate firefighting allocations.

JSW MotorsSambhajinagar

Fire pumps, hydrants, sprinklers, extinguishers and gas suppression. Fire stopping, signage and the associated fire package charges.

Commercial and residential

IKEA / INGKA CentreNoida, Uttar Pradesh

Fire pumps, sprinkler and hydrant distribution, with the required equipment and control interfaces.

Prestige BKC 101BKC, Mumbai

Fire pumps, wet risers, hydrants, sprinklers, water curtains and hose reels.

World Trade CentreGurugram, Haryana

MS fire fighting pipes and fittings, internal and external hydrants, sprinklers, valves and installation valves.

Public and institutional

Fire water distribution and firefighting systems within the assigned fire packages.

Fire protection systems within the airport MEPF package and associated building interfaces.

Firefighting scope as stated for each project. Shares marked illustrative show scope, not contract value, quantities or progress.

Fire alarm at Prestige BKC 101

Every life safety interface proved as one sequence.

Addressable fire alarm and voice evacuation for the office tower and the hotel.

Detect, confirm, evacuate, control, report

  1. 1

    Detect

    Addressable detectors in every room, ceiling void and plant space.

  2. 2

    Confirm

    One detector alerts. A second detector or a timeout raises the alarm.

  3. 3

    Evacuate

    Voice messages zone by zone, with live paging from the control room.

  4. 4

    Control

    Lifts recalled, pressurisation fans started, dampers and doors released.

  5. 5

    Report

    Status to the repeater panels, and to the BMS over a tested BACnet gateway.

About 6,000
Addressable detectors
About 2,800
Voice evacuation speakers
312
Cause and effect mappings
6
Networked fire alarm panels, with 5 repeaters

What we supply, install and prove

  • Panels and network

    Six networked fire alarm panels and five repeater panels, linked between the buildings on fibre.

  • Detection

    Smoke, heat, multi criteria and carbon monoxide detectors, with beam and gas detection.

  • Alarm devices

    About 280 manual call points and 700 sounders and strobes, with fire fighter telephone points.

  • Voice evacuation

    Digital amplifiers, zone paging, and ceiling, wall and horn speakers in both buildings.

  • Interfaces

    About 1,750 control, monitor and relay modules to lifts, fans, dampers, doors and DG sets.

  • Testing

    Gateway tested at the works, four phases of site testing, then a witnessed demonstration to the fire authority.

System to UL 864 and NFPA 72. Quantities are from the contract bills of quantities and are confirmed in the approved shop drawings.

Methods and DfMA

Controlled methods for fire and life safety.

Method 16

Very early smoke detection and staged fire response

Method 17

Double interlock pre action fire protection

Method 18

Clean agent suppression and enclosure integrity

DfMA

Fire protection, high fit

Sprinkler mains and risers, pre action valve sets, and pump and header skids.

How we deliver

One method on every project, from kick off to handover.

Seven parts from award to handover, with project controls and HSE and quality running through all of them.

24 hours
Kick off pack
From the kick off meeting to the pack reaching you
3 weeks
Rolling look ahead
Work fronts, labour, material and permits
10 days
Mobilisation
Anywhere in India, and 3 days in the National Capital Region
L1 to L5
Commissioning levels
Each signed off before the next begins
Project controls and monitoringBaseline programme, daily and weekly reports, three week look ahead and monthly review, measured by head office
HSE and qualityMethod statement and risk assessment before every activity, inspection at every stage, audits every two months
Throughout
Part 1 of 7

Kick off

Within 24 hours of the kick off meeting you receive one pack that sets out scope, people, dates and how we will report.

  1. 1

    Award handover

    Sales hands the award to the project team within 24 hours, in one folder.

  2. 2

    Project plan

    Programme, manpower, procurement and drawing plans, approved before anything is released.

  3. 3

    Kick off meeting

    Your team and ours agree scope, interfaces, dates and reporting.

  4. 4

    Kick off pack

    Sent to you within 24 hours of the meeting.

  5. 5

    Weekly targets

    Issued to every team each week from then on.

What you get in the kick off pack

  • Scope and interface matrix

    Who does what at every boundary with other contractors

  • Baseline programme

    Milestones tied to your handover sequence

  • TDS and procurement tracker

    Every submittal and order against its need date

  • Drawing tracker

    Every sheet with its submission and approval status

  • Communication and escalation matrix

    Named contacts, and who to call when something is stuck

  • Organogram and manpower plan

    The site team by name, and labour by trade and month

When

  • 24 hours

    From award to handover inside our team

  • 2 to 3 days

    To prepare the project plan

  • 24 hours

    From the kick off meeting to the pack reaching you

Also in the pack: risk register, HSE plan, quality plan with inspection and test plans, document register, and the bank guarantee and insurance tracker.

Method of working

How the work is controlled on site.

10 controlled methods connect Fire & Life Safety design intent to work sequence, inspection, testing and handover.

Review the full method index
CV-MS-16Civil & Interior

Fire Stopping Movement Joints and Compartment Interfaces

Masonry and Building Envelope

DC-MS-16Data Centre

Very Early Smoke Detection and Staged Fire Response

Fire and Life Safety

DC-MS-17Data Centre

Double Interlock Pre Action Fire Protection

Fire and Life Safety

DC-MS-18Data Centre

Clean Agent Suppression and Enclosure Integrity

Fire and Life Safety

EB-MS-14ELV & BMS

Fire Detection Interface and Cross System Response

ELV Infrastructure and Systems

HV-MS-11HVAC

Fire and Smoke Damper Installation and Testing

Air Systems