Air conditioning
AHUs, fan coil and scheduled DX/VRF equipment for the assigned buildings.
Assembly and test
Jagiroad, Assam
The project
HVAC works for the Jagiroad facility, covering air conditioning equipment, chilled water piping, ductwork and ventilation, with associated HVAC electrical work and controls.
Project overview
ActiveAHUs, fan coil and scheduled DX/VRF equipment for the assigned buildings.
Ducts, fans, chilled water networks, insulation and supports.
Starter panels, power/control wiring and field interfaces.
Air conditioning equipment, AHUs, FCUs and scheduled DX/VRF units. Chilled water piping, ductwork, ventilation, insulation, controls and seismic supports.
Shares of the HVAC package BOQ value, before GST. HVAC controls and condensate drainage remain within HVAC.
HVAC delivery across nine non plant buildings in the R03 BOQ.
Start a conversation