HVAC
Data Center Cooling.
White-space conditioning for colocation, hyperscale and HPC — aisle containment, CRAH/InRow/RDHX, liquid-ready paths and Tier 3/4-ready resilience.
Systems & scope
What this covers.
Aisle containment & airflow strategy
Hot-aisle or cold-aisle containment with brush seals at row ends, blanking panels in unused U-positions, and BMS-monitored supply-air temperature across the cold aisle. Supply-air managed to ASHRAE TC 9.9.
CRAH / CRAC perimeter cooling
Perimeter chilled-water CRAH units with EC plug fans, variable supply-air capacity, and BMS-modulated chilled-water valves. DX-based CRAC for sites without central chilled-water plant.
InRow & rear-door heat exchangers
InRow cooling units placed within the cabinet row for medium-high density loads. Rear-door heat exchangers for high-density (15-30 kW/rack) zones, including AI and HPC build-outs.
Liquid-ready architecture
Reserved liquid manifolds and cabinet-level Coolant Distribution Unit (CDU) drops for AI/HPC build-out. Direct-Liquid-Cooling pre-stubbed taps designed for non-disruptive migration from air to liquid.
Chilled-water plant & hydronics
Air- or water-cooled chillers sized for design-day ambient, staged for part-load efficiency. Primary–secondary or variable-primary headers with N+1/2N pumps on VFDs. Concurrent-maintainable cell isolation on towers.
Leak detection & containment
Zoned water-leak detection (WLD) under raised floors and along piping runs. BMS-integrated alarm hierarchy. Isolation valves at fault zones. Drip pans and bunding around all wet equipment.
Engineering approach
Air-side strategy is settled at design — hot/cold-aisle containment, perimeter CRAH or InRow units for medium-density halls, rear-door heat exchangers for high-density rows, liquid manifolds reserved at the cabinet for future HPC build-out. Supply-air setpoints are tuned to ASHRAE TC 9.9 with the operator's risk tolerance.
PUE is treated as a design output, not a marketing number. Free-cooling hours are calculated against the site's wet-bulb profile (water-side economiser) or dry-bulb (air-side where envelope permits). Chiller staging, pump VFDs and tower fan VFDs are sequenced for low part-load energy.
In delivery