Skip to content
Unique Engineers.

Industries we serve

Semiconductor & Cleanroom.

Cleanroom HVAC, process utilities, controls and validation for semiconductor and electronics manufacturing.

₹817 cr
Active semiconductor and industrial orders
Foxconn, Tata Electronics and JSW
14,000 sqm
On each of two cleanroom floors
ISO 7 and ISO 8 assembly cleanrooms for Foxconn in Bengaluru
3 months
To complete both floors
With more than 1,500 people on site
ISO 6
The engineering step is fully worked out
Class 10,000 and 100,000 executed

What we deliver in cleanrooms

Controlled environments, engineered, installed and validated by one contractor.

For semiconductor, electronics and battery manufacturing.

Scroll to move through the building

  1. Cleanroom HVAC, shown in a model of a cleanroom building

    01HVAC

    Cleanroom HVAC

    Make up air units, recirculation AHUs, fan filter units and HEPA terminal filtration, sized room by room to hold the ISO class, temperature and humidity.

    14,000 sqmOn each of two cleanroom floors for Foxconn in BengaluruISO 7 and ISO 8, completed in three months
  2. Pressure and airflow, shown in a model of a cleanroom building

    02HVAC

    Pressure and airflow

    Pressure differentials between zones, airlocks and anterooms, unidirectional or turbulent airflow set per room, and low level returns.

    15 PaAt least, between zonesTemperature and humidity held typically within 1°C and 5% RH
  3. Envelope and finishes, shown in a model of a cleanroom building

    03Cleanroom envelope

    Envelope and finishes

    Wall and ceiling panelling, cleanroom doors and view panels, epoxy flooring and sealed penetrations through every boundary.

    Foxconn, BengaluruWall and ceiling panelling, epoxy flooring, HEPA filtered AHUs, return air risers, cleanroom doors and view panels.
  4. Process utilities, shown in a model of a cleanroom building

    04Process piping

    Process utilities

    Compressed dry air, nitrogen and vacuum networks with point of use drops, routed with slope control and leak tested.

    Foxconn, BengaluruCompressed dry air, nitrogen and vacuum networks with complete precision MEPF, routed with strict slope control and leak tested.
  5. Process cooling water, shown in a model of a cleanroom building

    05Process piping

    Process cooling water

    Closed loop headers and branch distribution in SS 316 and PP H, hydro and pneumatic tested, with OEM validated hook ups.

    Foxconn, BengaluruClosed loop process water headers, primary and secondary interfaces, SS 316 and PP H piping, hydro and pneumatic testing.
  6. Electrical and lighting, shown in a model of a cleanroom building

    06Electrical

    Electrical and lighting

    Clean power distribution, cleanroom lighting, containment and earthing installed to avoid vibration and particle shedding.

    Foxconn, BengaluruElectrical distribution and equipment connections across the awarded work orders. Power, cabling and energisation interfaces for manufacturing and support areas.
  7. Plumbing and public health, shown in a model of a cleanroom building

    07Plumbing

    Plumbing and public health

    Water supply and drainage, water and sewage treatment, rainwater harvesting and reuse, and sanitary installations for gowning and support areas.

  8. Fire and life safety, shown in a model of a cleanroom building

    08Fire

    Fire and life safety

    Hydrants and sprinklers, fire pumps and pump rooms, clean agent suppression, fire alarm and public address, and fire stopping of service penetrations.

    Foxconn, BengaluruFirefighting networks, equipment and building interfaces within the campus MEPF work orders.
  9. Controls and monitoring, shown in a model of a cleanroom building

    09BMS and controls

    Controls and monitoring

    PLC and BMS control of MAUs, AHUs and FFUs, with continuous pressure, temperature, humidity and particle monitoring.

    Foxconn, BengaluruPLC panels, HMI and automatic controls. Temperature, humidity and differential pressure monitoring, leak detection and particle counters.
  10. Civil and enabling works, shown in a model of a cleanroom building

    10Civil

    Civil and enabling works

    Foundations and enabling works, raised floors and precision grouting, trenches and utility corridors, partitions and interiors.

    Foxconn, BengaluruCivil works within the campus packages. Cleanroom envelope interfaces, service openings, equipment access and local making good within the assigned packages.
  11. Validation and handover, shown in a model of a cleanroom building

    11All services

    Validation and handover

    IQ, OQ and PQ to ISO 14644 Part 3, balancing to AABC or NEBB procedures, and a complete validation dossier at handover.

    3 monthsTo complete both Foxconn cleanroom floorsWith more than 1,500 people on site

Why Unique Engineers

Value we add beyond installing the specification.

Eight things clients get from us in addition to the installation itself. The first five each have a page of their own.

Start a conversation

Let’s discuss your project.

Get in touch