DfMA and modular MEP.

Spools, riser sets, valve stations and pump skids built and tested off site, then lifted in when the workfront is ready.

DfMA and modular MEP

One module, built and tested off site.

Start with repeatable geometry, stable vendor data and accessible connections; keep variable interfaces flexible.

Scroll to take the module apart

  1. Module frame, shown in a model of a multi service module

    01Standardise

    Module frame

    Module families, joints and lift limits defined so repeated halls and floors use the same assemblies. Built on jigs to frozen dimensions, with fixed datums and repeatable joints.

  2. Mechanical, high fit, shown in a model of a multi service module

    02DfMA suitability by service

    Mechanical, high fit

    Chilled water spools and headers, pump and CDU skids, valve stations and CRAH connection sets.

  3. Electrical, high fit, shown in a model of a multi service module

    03DfMA suitability by service

    Electrical, high fit

    Multi tier cable containment, busway sections, power skids and earthing assemblies.

  4. Fire protection, high fit, shown in a model of a multi service module

    04DfMA suitability by service

    Fire protection, high fit

    Sprinkler mains and risers, pre action valve sets, and pump and header skids.

  5. Plumbing, medium fit, shown in a model of a multi service module

    05DfMA suitability by service

    Plumbing, medium fit

    Condensate and drainage headers and booster sets, where falls can be controlled.

  6. Controls and ELV, medium to high fit, shown in a model of a multi service module

    06DfMA suitability by service

    Controls and ELV, medium to high fit

    Control panels built and function tested off site, skid wiring, containment and junction boxes.

  7. QA and dispatch, shown in a model of a multi service module

    07Five gates before dispatch

    QA and dispatch

    Tested, recorded and packed with caps, covers and a traceable module ID. Pressure tests on piping, insulation resistance on electrical, functional checks on skids.

  8. Site integration, shown in a model of a multi service module

    08Factory to site

    Site integration

    Lifted to the released landing zone, aligned and interconnected.

    AdaniConneX HYD 22 and HYD 23, HyderabadFire protection and HVAC spools and assemblies built off site. Modules travel about 40 km from the DfMA setup.

DfMA and modular MEP

Built and tested off site. Lifted in when the workfront is ready.

Assemblies are built and tested off site, then lifted in when the workfront is ready. No module leaves the workshop until its quality gates are closed.

Receiving and storage

Five gates before dispatch

  1. G1

    Material and certificates

    Incoming material checked against the approved submittal and certificate of conformity.

  2. G2

    BIM and dimensions

    Module checked against the frozen model: lengths, datums and connection points.

  3. G3

    Weld, groove and torque

    Joints inspected for weld quality, groove profile and bolt torque.

  4. G4

    Pressure, IR and function

    Pressure tests on piping, insulation resistance on electrical, functional checks on skids.

  5. G5

    Dossier and dispatch

    Records closed; module tagged, protected and released for transport.

On our projects: AdaniConneX HYD 22 and HYD 23, Hyderabad, with fire protection and HVAC assemblies prefabricated off site.

The model is frozen before fabrication.

Every module passes five gates before it can leave the workshop.

  1. 1

    Coordinate

    Routes, access, maintainability and interfaces frozen in the federated model at LOD 400.

  2. 2

    Standardise

    Module families, joints and lift limits defined so repeated halls and floors use the same assemblies.

  3. 3

    Release

    GA and spool drawings, bill of materials, weld map, QA plan, tags and lifting data issued as one pack.

  4. 4

    Fabricate and close

    Built on jigs to frozen dimensions at a near site hub, inspected, tested, recorded and protected before dispatch.

Factory to site

  • Dispatch

    Modules sequenced to the installation window.

  • Lift plan

    Route, rigging, crane and landing zone confirmed before dispatch.

  • Install

    Lift to the released landing zone, set datums, connect and inspect.

Hold point: no module leaves the workshop until its quality gates are closed, and none is lifted until the workfront and lift plan are released.