Solar & Renewable
Net Metering & Grid Integration.
DISCOM-coordinated net metering, gross metering, captive PPAs and the grid-protection layer that ties solar to the utility.
Systems & scope
What this covers.
Net metering hardware
Bi-directional ABT-class energy meters per DISCOM specification. Sealed by the DISCOM inspector at commissioning. Trend data accessible via Modbus.
Grid protection
Anti-islanding protection per IEEE 1547 / CEA, over/under-frequency and voltage protection, ROCOF and vector-shift relays where required.
DISCOM coordination
Application, approval, hardware compliance verification, and witness testing with the DISCOM. Final approval letter retained in the project handover dossier.
Engineering approach
DISCOM application is filed at design freeze with full single-line diagram, protection coordination report and inverter datasheets. Approval timelines are tracked as critical-path items in the project schedule.
Protection logic is verified by primary injection at commissioning, with anti-islanding tested per the DISCOM's witness protocol. ABT-class meters are sealed and commissioned with the DISCOM inspector present.