Solar & Renewables.

Solar PV and electrical integration within a coordinated energy strategy.

Our scope

What we deliver.

Solar PV and electrical integration within a coordinated energy strategy.

01

Rooftop and ground mounted solar PV

02

Inverter integration

03

Electrical protection

04

Net metering

On our projects

Solar delivered with the MEPF package.

IKEA / INGKA Centre, Noida

PV solar under Package 2A

Integrated MEPF and PV solar works under Package 2A, including PNG services and coordinated delivery across the mixed use development.

IKEA / INGKA Centre, Noida

Within the electrical scope

Electrical distribution, lighting, cabling, earthing and equipment connections. Scheduled PV solar works across the basement, retail and common areas.

BITSoM campus, Kalyan

Solar on the BMS

Chiller plant, DG sets, transformers, LT panels, solar, energy meters, pumps, fire alarm and lifts on one head end.

Explore the systems

A closer look.

Rooftop PV systems for corporate campuses, warehouses, mixed use developments and industrial estates: net metered and BMS monitored.

Explore Rooftop Solar

Project

The INGKA Centre package.

IKEA / INGKA Centre, NoidaActive

IKEA / INGKA Centre, Noida

Mixed use campus for INGKA Centres in Noida, Uttar Pradesh.

Client
INGKA CentresIKEA mixed use development
Location
Noida, Uttar Pradesh
Status
ActivePackage 2A
Work order value
₹410 crAugust 2026 order book
Facility
Mixed use campusRetail and common areas
Programme
Package specific

Integrated MEPF and PV solar works under Package 2A, including PNG services and coordinated delivery across the mixed use development.

View the case study
01

MEP

MEPF, PV solar and PNG.

02

BMS

HVAC controls and integration interfaces.

03

Civil

Builders’ work coordination.

Scope of work by service

Select a service

Electrical distribution, lighting, cabling, earthing and equipment connections. Scheduled PV solar works across the basement, retail and common areas.

MEP totals 96%: HVAC 40%, Electrical 32%, PHE 14% and FF 10%. ELV & BMS is 4%. The split illustrates scope; it does not measure contract value, quantities or progress.

Coordinated shop drawings, system inspections, TAB, integrated testing and phased handover.

How we deliver

One method on every project, from kick off to handover.

Seven parts from award to handover, with project controls and HSE and quality running through all of them.

24 hours
Kick off pack
From the kick off meeting to the pack reaching you
3 weeks
Rolling look ahead
Work fronts, labour, material and permits
10 days
Mobilisation
Anywhere in India, and 3 days in the National Capital Region
L1 to L5
Commissioning levels
Each signed off before the next begins
Project controls and monitoringBaseline programme, daily and weekly reports, three week look ahead and monthly review, measured by head office
HSE and qualityMethod statement and risk assessment before every activity, inspection at every stage, audits every two months
Throughout
Part 1 of 7

Kick off

Within 24 hours of the kick off meeting you receive one pack that sets out scope, people, dates and how we will report.

  1. 1

    Award handover

    Sales hands the award to the project team within 24 hours, in one folder.

  2. 2

    Project plan

    Programme, manpower, procurement and drawing plans, approved before anything is released.

  3. 3

    Kick off meeting

    Your team and ours agree scope, interfaces, dates and reporting.

  4. 4

    Kick off pack

    Sent to you within 24 hours of the meeting.

  5. 5

    Weekly targets

    Issued to every team each week from then on.

What you get in the kick off pack

  • Scope and interface matrix

    Who does what at every boundary with other contractors

  • Baseline programme

    Milestones tied to your handover sequence

  • TDS and procurement tracker

    Every submittal and order against its need date

  • Drawing tracker

    Every sheet with its submission and approval status

  • Communication and escalation matrix

    Named contacts, and who to call when something is stuck

  • Organogram and manpower plan

    The site team by name, and labour by trade and month

When

  • 24 hours

    From award to handover inside our team

  • 2 to 3 days

    To prepare the project plan

  • 24 hours

    From the kick off meeting to the pack reaching you

Also in the pack: risk register, HSE plan, quality plan with inspection and test plans, document register, and the bank guarantee and insurance tracker.

Method of working

How the work is controlled on site.

9 controlled methods connect Solar & Renewables design intent to work sequence, inspection, testing and handover.

Review the full method index
EB-MS-07ELV & BMS

Energy Metering and Consumption Reporting

Controls and Automation

EL-MS-10Electrical

UPS Systems and Battery Energy Storage

Emergency and Critical Power

EL-MS-18Electrical

Energy Metering and Power Quality Monitoring

Testing Protection and Power Quality

EL-MS-25Electrical

Residential Main Distribution and Metering

High End Real Estate and Energy

EL-MS-26Electrical

Electric Vehicle Charging Infrastructure

High End Real Estate and Energy

EL-MS-27Electrical

Solar PV and Grid Tied Inverter Integration

High End Real Estate and Energy

Start a conversation

Let’s discuss your project.

Get in touch