Design and engineering
BMS and ELV design, IO schedules, panel and network design.

What we do
Connected controls, monitoring and security that bring building systems together.
Intelligent Solutions division
It works inside our MEP packages and on standalone contracts for outside clients.
The team
BMS and ELV design, IO schedules, panel and network design.
BMS and ELV engineers who program, loop check and commission on site.
AMC, remote monitoring and energy analytics after handover.
How we are engaged
Prestige BKC 101, CtrlS data centres and Nalanda University.
BITSoM campus, and AHU and MAU controls for Foxconn.
Annual maintenance, BMS audits and cloud monitoring.
BMS and ELV systems
What we design, install, integrate and commission.
Explore the systems
Distributed Direct Digital Control panels and field devices for HVAC, plumbing, electrical and fire system integration.
Explore DDC & Field ControlsSystem architecture
On open protocols, so every system in the building reports to one head end.

What we integrate, and how
Chillers and plant managers, drives and pumps, energy meters, DG sets and UPS, fire alarm, lifts, water and sewage plant, solar.
BACnet IP and MS/TP, Modbus, LON and SNMP. Delivered on Honeywell WEBs on the Niagara framework, on Siemens, and on PLC based control.
Operator graphics
Operator screens from two of our projects, redrawn in one style. Trends and alarms are on every page.

BITSoM runs on Honeywell WEBs on the Niagara framework. ATC Tower Kolkata runs on Siemens. Names and values follow the screens our team built.
BMS and ELV references
For campuses, offices, hospitals, plants and data centres.

Rajgir, Bihar
IBMS for a net zero campus, with AMC

Kalyan, Mumbai
Integrated BMS across 21 blocks

Mumbai
BMS, fire alarm, voice evacuation, ELV and security

Noida
Chiller plant manager and HVAC plant controls

Bengaluru
PLC control of AHUs and MAUs in 13 buildings

Navi Mumbai and Hyderabad
IBMS, EPMS, VESDA, access control and CCTV

Kolkata
IBMS with the MEP package

Jammu
IBMS with the HVAC package
Also delivered
Projects
CompletedIBMS for a net zero university campus in Rajgir, Bihar.
IBMS and plant monitoring for a net zero campus, delivered with the HVAC, thermal storage and geothermal systems, and maintained by our service team after handover.
View the case studyBrine and screw chillers, thermal storage, pumps and heat exchangers monitored on one system.
Energy meters and trend logs across the plant rooms, with weekly and monthly consumption logs.
Annual maintenance by our service team, with the operating data kept for analysis.
Scope and delivery in detail
Supply, installation, testing and commissioning of one integrated BMS for 21 blocks, on Honeywell WEBs with BACnet IP.
Sensors and switches on air, water, transformers and DG sets.
IP controllers in panels in the electrical and hub rooms.
Gateways that read third party plant over BACnet and Modbus.
Network switches and racks in the blocks, linked on fibre.
Three supervisory controllers of 10,000 points each.
Server, three client licences and ten web clients.
What the BMS monitors and controls
Air handling units with EC fans, ceiling suspended and fan coil units, heat recovery units, and VRF in the hostels.
Energy meters and load managers in the blocks, UPS, transformer temperatures and DG sets.
Fire, domestic and flushing tank levels on 57 transmitters, and the sewage and water treatment plants.
Lifts in the blocks, and the fire alarm panels read over a BACnet interface.
Supply and exhaust fans, scrubbers in the dining hall, and 167 filter status switches.
Operating logic for the whole HVAC system, alarms, trends and reports, with 20 percent spare points.
Counts are from the IO point summary and bill of quantities in our offer and kick off documents.
The kick off meeting was held on 7 May 2026 with the project documents prepared in advance. Site work followed in building waves.
7 May 2026, with the draft project documents tabled for review.
97 datasheets, 67 drawings and 19 IO summaries taken through approval.
First material received at site on 17 June 2026.
Started on 18 June. About 16,700 m laid in the first four weeks.
DDC panels, integrators, sensors and the campus network installed.
Graphics, logic, point by point testing, training and handover.
In the kick off pack
30 stakeholders, and more than 60 activities each with one accountable owner
Four levels, from same day at site to the Managing Director
10 phases, 26 work packages and 133 activities with a critical path
Every bill item with its submittal, order and delivery status
Every drawing with target and actual submission and approval dates
28 checks and 7 hold points, from material receipt to handover
On the project
From the kick off meeting to the first cable on site
People planned at peak, on site and at head office
Defect liability period after handover
Also in the pack: a manpower mobilisation plan in five phases, a risk register of 20 risks, the method statement, HSE plan and site logistics plan.
Design, supply, installation, testing and commissioning of the building management system for the office tower and the hotel, on one architecture.
Sensors for temperature, humidity, CO2, pressure and level.
DDC controllers in lockable panels, on BACnet IP.
Plant with its own controls, read over BACnet and Modbus gateways.
Fibre backbone, with BMS switches and racks in the ELV rooms.
Servers with hot standby, graphics, alarms, trends and web access.
Tenant energy bills and energy analysis from the same data.
What the BMS controls and monitors
Five water cooled chillers, cooling towers and variable speed pumps, through the plant optimiser.
Air handling, fresh air and fan coil units on every floor, with VAV and VRF units in the hotel.
Basement jet fans, exhaust fans, and staircase and lift lobby pressurisation fans.
Pumps, tank levels and the municipal water meter. LT panels on every floor, UPS and DG sets.
Chilled water BTU meters and electricity meters for each tenant, with bills raised from the BMS.
Lifts, fire alarm, car park ventilation and parking management read on the same head end.
Quantities are from the contract bills of quantities and are confirmed in the approved shop drawings.
Addressable fire alarm and voice evacuation for the office tower and the hotel, with every life safety interface proved as one sequence.
Addressable detectors in every room, ceiling void and plant space.
One detector alerts. A second detector or a timeout raises the alarm.
Voice messages zone by zone, with live paging from the control room.
Lifts recalled, pressurisation fans started, dampers and doors released.
Status to the repeater panels, and to the BMS over a tested BACnet gateway.
What we supply, install and prove
Six networked fire alarm panels and five repeater panels, linked between the buildings on fibre.
Smoke, heat, multi criteria and carbon monoxide detectors, with beam and gas detection.
About 280 manual call points and 700 sounders and strobes, with fire fighter telephone points.
Digital amplifiers, zone paging, and ceiling, wall and horn speakers in both buildings.
About 1,750 control, monitor and relay modules to lifts, fans, dampers, doors and DG sets.
Gateway tested at the works, four phases of site testing, then a witnessed demonstration to the fire authority.
System to UL 864 and NFPA 72. Quantities are from the contract bills of quantities and are confirmed in the approved shop drawings.
Security, network and communication systems for the office tower, from containment and cabling to head end and commissioning.
Boom barriers, road barriers and long range vehicle tag readers at the gates.
Baggage scanners, walk through metal detectors and visitor management.
Flap barriers with card readers, linked to the lift destination control.
Access controlled doors, CCTV, Wi Fi and data points on every floor.
Video, access and intruder alarm software, with a display wall.
What we supply, install and commission
Dome and bullet cameras, with video management, recording servers, storage and monitoring workstations.
About 450 readers and 420 electromagnetic locks, with duress alarms, intruder alarm and time and attendance.
9 boom barriers, 4 road barriers, 12 flap barrier lanes, 5 baggage scanners and 5 metal detector gates.
CAT6 to every point and a fibre backbone with primary and backup routes, racks and patching.
Core and PoE switches, wireless controllers, and wireless links to the lift cars.
Tenant fibre risers, DTH, telephone exchange, digital signage, and server, ISP and mobile signal rooms.
Hotel ELV is by others. Quantities are from the contract bill of quantities and are confirmed in the approved shop drawings.
Intelligent building solutions
A BMS shows what is happening now. The cloud and AI layer we add shows what is about to fail and where money is being lost.

Our role
We survey the building, connect the BMS and plant, and configure the platform.
Our engineers keep the BMS, the sensors and the platform working under AMC.
Insights are reviewed with you every quarter, with actions and savings.
Solutions we offer
They sit above the BMS and work across one building or a portfolio.
Analytics and equipment models show asset availability and performance problems across a portfolio, and track each service case to closure.
Energy data brought together to monitor, control and optimise consumption and scope 1 and 2 emissions, with reports for ESG disclosure.
Building software, systems and devices managed through a single interface, on any device.
AI agents for facility operations: managing alarms, predicting equipment issues and finding energy savings.
What we do
Which solutions fit your building, its BMS and its metering.
Connect the site, map the points, and set up dashboards, rules and users.
Watch the alerts, act on service cases and maintain the system under AMC.
Your BMS, meters and plant feed a cloud platform, which returns dashboards, service cases and reports.
Cloud and AI services
Faults are found from the data while the equipment is still running, so repairs are planned and not emergencies.

Models learn how each chiller, pump and AHU behaves when healthy.
Drift in temperature, power, vibration or valve response is flagged early.
Each fault is ranked by cost and risk, with its likely cause.
A service case is raised and our engineer attends with the right part.
The trend is checked after the fix and the case is closed.
What you get
Every monitored asset with its condition and trend
What to fix first, and what waiting will cost
Each case from alert to closure, with evidence
What is tracked
Every building on one dashboard, watched by our service desk and visible to you on any device.

What it gives you
Comfort, energy, alarms and asset status for all your buildings in one place.
Alarms prioritised and sent to our service desk, not left on a screen in the plant room.
Schedules, setpoints and minor logic changed remotely, without a site visit.
Asset health and energy reports every quarter, with controller configurations and trend logs backed up.
What is watched
A pilot audit on a net zero university campus. AI agents read the BMS trend logs, found the faults and the waste, and put a rupee value on each fix.
What the data showed
The thermal storage tank was being charged in the morning peak. Moving it to 22:00 to 06:00 saves ₹8.14 lakh a year.
Delta T of 0.77°C against a design of 5.5 to 7°C, traced to a valve stuck open in one building.
Open circuits, frozen readings and impossible values, found from the data before any site visit.
An empty hall held at 19.5°C at 3 am. A night schedule and a higher setpoint fix it at no cost.
Measured against design
Chilled water delta T, design
Chilled water delta T, measured
Peak tariff a unit, against ₹4.50 off peak
Pilot audit, March 2026. Savings are annual estimates from measured power and the site tariff, each checked independently before it was reported. A further ₹2.50 lakh a year was verified for drives on the chilled water pumps.
We put the platform in, keep the BMS under it healthy, and stay accountable for the results under a comprehensive AMC.
Existing BMS, sensors and sequences checked; faults listed and costed.
BMS, meters and plant data connected to the cloud platform.
Points mapped, dashboards built, alarms and rules set with your team.
Our service desk watches alarms and asset health, and attends site.
Faults closed, energy saved and next actions reviewed every quarter.
Comprehensive AMC
Health checks, firmware updates, backups and calibration
On site support for faults and breakdowns
Alarm and schedule optimisation, remote diagnostics
Quarterly reports with asset health and recommendations
Faulty BMS components replaced under the contract
Controller configurations and trend logs backed up
Visits and term
Full system audit, then sensor calibration
Network diagnostics, then the year end review and backup
Comprehensive AMC term offered, renewable
Seven client sites are on AMC and O&M with our service team today.
How we deliver
Seven parts from award to handover, with project controls and HSE and quality running through all of them.
Within 24 hours of the kick off meeting you receive one pack that sets out scope, people, dates and how we will report.
Sales hands the award to the project team within 24 hours, in one folder.
Programme, manpower, procurement and drawing plans, approved before anything is released.
Your team and ours agree scope, interfaces, dates and reporting.
Sent to you within 24 hours of the meeting.
Issued to every team each week from then on.
What you get in the kick off pack
Who does what at every boundary with the other trades
Three levels, from milestones to daily activities with a critical path
Every submittal and order against its need date
Every drawing and IO summary with its submission and approval status
Named contacts, RACI, and who to call when something is stuck
The site team by name, and the crew by trade and week
When
From award to handover inside our team
To prepare the project plan
From the kick off meeting to the pack reaching you
Also in the pack: risk register, HSE plan, quality plan with inspection and test plan, method statement and site logistics plan.
The system is designed on paper before anything is bought. Every point, panel, cable and sequence is drawn, checked and approved.
Site and plant surveyed; drawings, specification and BOQ studied; gaps raised as RFIs.
Every point listed by plant, by controller and by signal type.
Architecture, network, panel and cable drawings prepared.
Internal QA/QC of every drawing before it is submitted.
Submitted for approval, then issued to site as good for construction.
What you get
The master list of every hardwired and integrated point
System block diagram, network topology and controller layout
General arrangement, wiring and terminations for every panel
Every cable run, floor by floor, with its containment
Control sequences and cause and effect, written before programming
Operator screens and the list of third party integrations
When
Drawing targets set and reviewed
RFIs logged and sent, and replies distributed
From preparation and internal check to approval and as built
BMS and ELV design sits in the Intelligent Solutions division, backed by the company design and BIM team of 50.
Nothing is ordered before its datasheet is approved, and every order is tracked against the date the site needs it.
Technical data sheet format agreed within 3 days; submittals follow the weekly target.
Your approval tracked item by item against the approved make list.
Placed at head office, with long lead items released first.
Control panels, integrators and sensors tested before dispatch to site.
Every delivery inspected against its approved datasheet before issue.
What you get
Every submittal with make, status and approval date
Every item with order date and delivery against need date
For control panels, integrators and sensors
Raised for every delivery, with test and calibration certificates
Supplied from your approved make list, with no deviation unless you approve it
Deliveries chased every week from a dedicated expediting desk
Purchase order released in
Bulk items
Mid lead items
Equipment
A team of 35 in purchase, procurement and stores.
Site office, supervision and the first workforce within three days in the National Capital Region and ten days anywhere in India.
Staff transferred or hired within 2 weeks; key staff put to you for approval.
Site taken over; site office and stores set up.
Insurance, registrations and labour compliance before anyone enters.
Tools and test instruments mobilised, with valid calibration certificates.
Every worker inducted and issued PPE before the first day of work.
What you get
The site team by name, with key staff for your approval
Planned crew by trade and week, wave by wave
Office, stores, tools and instruments confirmed before work starts
Policies and bank guarantees with their expiry dates
Site specific, prepared by the HSE officer
Registrations and records in place before workers enter
When
Site office, supervision and first workforce in the National Capital Region
The same anywhere in India
Site staff deployed, or it is escalated
Four delivery clusters: North, West, South and East.
Work starts on a front only when everything it needs is in place, and each stage is inspected and recorded before the next.
Conduit and tray installed and inspected before any cable is pulled.
Cables laid clear of power cables, then tested and tagged.
Control panels mounted, earthed and inspected before they are energised.
Sensors and actuators mounted to drawing and wired with correct polarity.
Switches, racks and fibre links installed and tested.
Cores ferruled and terminated to the approved wiring drawing.
No activity starts without
Approved and issued through document control
Inspected and accepted on delivery
Approved for the activity and briefed to the crew
An inducted crew with its supervisor
Inspected, with calibration in date
Raised before work starts
When
Toolbox talk before work begins
HSE inspection and progress record
Look ahead plan issued to site and vendors
Hold points on a BMS package: first material at site, conduit complete, panel mounting, cable tests, first third party communication, testing complete and the final walkthrough.
Six stages of proof. Each is recorded and signed off before the next begins.
Panels inspected and tested at the works before dispatch.
Insulation resistance and continuity on every cable; earthing verified.
Each physical point verified from the field device to the controller.
Sensors calibrated with NABL calibrated instruments, and loops proved.
Control sequences and cause and effect proved with fire and plant interfaces.
Cross system scenarios with failure injection, recovery and evidence.
What you get
For every control panel
Insulation resistance and continuity
For every instrument used, NABL calibrated
Every point, signed off
Witnessed by your team
On the screens, alarms and trends they will use
On our projects
Cause and effect mappings on Prestige BKC 101
Sensors and meters in one Foxconn package
IO summaries approved for the BITSoM campus
A complete record, a trained operating team and support through the defects liability period.
Joint walkthrough of the full system, and a snag list closed against agreed dates.
Drawings and point lists updated to the installed condition.
Controller programs, databases and graphics backed up and handed over.
Your operators trained on the screens, alarms and trends they will use.
Completion recorded and the defects liability period begins.
Handover dossier
Every drawing and point list in its installed condition
System block diagram, equipment manuals and maintenance schedules
Point to point, loop check, sequence and integrated test records
For sensors, and for every test instrument used
Backups of programs, databases and graphics, with licences and passwords
Attendance and topics for every operator trained
After handover
Service engineers attend defects through the defects liability period
Quarterly preventive visits, calibration, backups and remote support
AMC and O&M from our service team, on seven client sites today
Progress and cost are measured by a head office team, not self reported by the site, and reported to you on a fixed rhythm.
One resource loaded programme, locked and tied to your milestones.
A three week rolling look ahead drives labour, material and permits.
Progress and cost measured by head office project control.
Weekly review with the Chief Projects Officer on one dashboard.
Variance is seen while options remain, and a recovery plan follows.
What you get
Work done and manpower on site, building by building
Planned against actual, with the look ahead
Work fronts, labour, material and permits needed
Progress, variance and change tracking
Every action with an owner and a date
One view of progress for your PMO
When
Progress report from site
Progress report, look ahead and review meeting
Variance and changes, with HSE and quality reports
A team of 30 in planning, scheduling and project controls.
Zero incidents and zero defects are project objectives, held by teams that are on every site every day.
Site HSE plan, quality plan and inspection and test plans approved before work starts.
QA/QC writes the method statement and HSE adds the risk assessment.
Every worker inducted; a toolbox talk at the start of every shift.
A permit for every high risk task and an inspection at every hold point.
Daily HSE inspection, audits every two months, and every NCR closed.
How it is held
No work front opens without an HSE person present. Every worker has a medical examination and an induction before entry, and incidents are reported at once.
Site QC engineers report to the Head of Quality at head office, not to the site they inspect. Work starts only after the quality plan and test plans are approved.
What you get
Method statement library
The core set is issued for every package, with the extension that matches the facility.
Start a conversation