Defects liability period
Service engineers attend defects through the defects liability period.

What we do
Planned maintenance, operational support and system checks throughout the life of a facility.
After handover
AMC and O&M from our service team, on seven client sites today.
Service engineers attend defects through the defects liability period.
AMC and O&M service across seven client sites with a field team of engineers and technicians.
Preventive and predictive maintenance and rapid response teams, including continuous HVAC operation for NCR hospitals in the pandemic.
Your operating team trained on the installed systems, with a complete handover record.
Every building on one dashboard, watched by our service desk and visible to you on any device.
BMS audit, alarm rationalisation, anomaly detection and lifecycle insight from operating data on O&M and Intelligent Solutions sites.
On our projects
Data centre grade cooling and controls delivered and then operated for three years inside a government contracting framework.
Annual maintenance by our service team, with the operating data kept for analysis.
Eight campuses and schools since FY17: universities and schools with lifecycle O&M.
Operation and maintenance of the building management system for one year after handover.
Comprehensive AMC
For BMS and controls: we keep the system healthy and stay accountable for the results under a comprehensive AMC.
Existing BMS, sensors and sequences checked; faults listed and costed.
BMS, meters and plant data connected to the cloud platform.
Points mapped, dashboards built, alarms and rules set with your team.
Our service desk watches alarms and asset health, and attends site.
Faults closed, energy saved and next actions reviewed every quarter.
What it covers
Health checks, firmware updates, backups and calibration
On site support for faults and breakdowns
Alarm and schedule optimisation, remote diagnostics
Quarterly reports with asset health and recommendations
Faulty BMS components replaced under the contract
Controller configurations and trend logs backed up
Visits and term
Full system audit, then sensor calibration
Network diagnostics, then the year end review and backup
Comprehensive AMC term offered, renewable
How we deliver
Seven parts from award to handover, with project controls and HSE and quality running through all of them.
Within 24 hours of the kick off meeting you receive one pack that sets out scope, people, dates and how we will report.
Sales hands the award to the project team within 24 hours, in one folder.
Programme, manpower, procurement and drawing plans, approved before anything is released.
Your team and ours agree scope, interfaces, dates and reporting.
Sent to you within 24 hours of the meeting.
Issued to every team each week from then on.
What you get in the kick off pack
Who does what at every boundary with other contractors
Milestones tied to your handover sequence
Every submittal and order against its need date
Every sheet with its submission and approval status
Named contacts, and who to call when something is stuck
The site team by name, and labour by trade and month
When
From award to handover inside our team
To prepare the project plan
From the kick off meeting to the pack reaching you
Also in the pack: risk register, HSE plan, quality plan with inspection and test plans, document register, and the bank guarantee and insurance tracker.
An in house team of 50 design engineers, BIM coordinators and modellers turns the tender design into coordinated drawings the site can build from.
Tender drawings, specification and BOQ studied; gaps raised as RFIs.
A drawing file prepared for each service.
All services combined in one model and clashes resolved.
Internal QA/QC of every drawing before it is submitted.
Submitted for approval, then issued to site as good for construction.
What you get
Every sheet: planned, submitted, approved and issued
Every service coordinated on one set
A coordinated model for every model led project
Every query with its date raised and date answered
Spool drawings and cut lists for prefabricated work
Updated from site records and compiled at handover
When
Drawing targets set and reviewed
RFIs logged and sent, and replies distributed
Procurement is 60 to 70 percent of project cost, so every order is placed from head office and tracked against the date the site needs it.
Technical data sheet format agreed within 3 days; submittals follow the weekly target.
Your approval tracked item by item, with samples where specified.
Placed at head office against a rate library and annual rate contracts.
Deliveries chased every week; factory tests witnessed on critical packages.
Inspected on delivery; only accepted material is issued to work.
What you get
Every submittal with make, status and approval date
Every item with order date and delivery against need date
Before dispatch of chillers, switchgear, UPS and pumps
Raised for every delivery, with test certificates
Standing relationships with the makes consultants specify
Dispatch chasing from a dedicated expediting desk
Purchase order released in
Bulk items
Mid lead items
Equipment
A team of 35 in purchase, procurement and stores.
Site office, supervision and the first workforce within three days in the National Capital Region and ten days anywhere in India.
Staff transferred or hired within 2 weeks; key staff put to you for approval.
Site taken over; site office and stores set up.
Insurance, registrations and labour compliance before anyone enters.
Tools, tackles and machinery mobilised and inspected.
Every worker inducted and issued PPE before the first day of work.
What you get
The site team by name, with key staff for your approval
Planned labour by trade and month
Office, stores, tools and plant confirmed before work starts
Policies and bank guarantees with their expiry dates
Site specific, prepared by the HSE officer
Registrations and records in place before workers enter
When
Site office, supervision and first workforce in the National Capital Region
The same anywhere in India
Site staff deployed, or it is escalated
Four delivery clusters: North, West, South and East.
Work starts on a front only when everything it needs is in place, and each stage is inspected and recorded before the next.
Weekly plan of fronts, labour and material.
Front taken over; a blocked front is reported within 24 hours.
Six things confirmed before the activity starts.
Our own engineers and supervisors on every front.
Internal check first, then an inspection request to you.
Progress recorded daily; joint measurement for billing.
No activity starts without
Approved and issued through document control
Inspected and accepted on delivery
Approved for the activity and briefed to the crew
An inducted crew with its supervisor
Inspected every month
Raised before work starts
When
Toolbox talk before work begins
HSE inspection and progress record
Look ahead plan issued to site and vendors
170 engineers, supervisors and foremen in site execution, with more than 2,500 labour on roll and through vendors.
Five levels, each signed off and witnessed by you where required before the next begins.
Datasheet, serial and tag check, physical integrity and receipt inspection.
Insulation resistance, pressure and leak tests, flushing and cleanliness.
Powered tests of pumps, fans, VRF, AHUs, DG sets and panels against design.
End to end with BMS: changeover, alarms, interlocks and balancing.
Fire mode cause and effect, grid failure and DG takeover.
What you get
Sequence and witness points agreed before the first test
Baseline, failure injection, recovery and evidence
NABL calibrated, with certificates on record
To ASHRAE, AABC and NEBB procedures
Levels 1 to 5, each signed off before the next begins
Closed against dates agreed with you
Team
Commissioning engineers and technicians in mobile teams
Projects taken to handover in a year
A complete record, a trained operating team and support through the defects liability period.
Joint inspection, and a snag list closed against agreed dates.
Drawings and model updated from site records.
Compiled by document control from engineering, procurement and quality.
Your operating team trained on the installed systems.
Completion recorded and the defects liability period begins.
Handover dossier
The federated model with the final drawings
With serial numbers for your asset register
Installation, operation and maintenance manuals
Test packs, balancing reports and calibration certificates
Vendor warranties and spare part lists
Operator training records, fire authority approvals and NOC
After handover
Service engineers attend defects through the defects liability period
AMC and O&M from our service team, on seven client sites today
Progress and cost are measured by a head office team, not self reported by the site, and reported to you on a fixed rhythm.
One resource loaded Primavera P6 programme, locked and tied to your milestones.
A three week rolling look ahead drives labour, material and permits.
Progress and cost measured by head office project control.
Weekly review with the Chief Projects Officer on one dashboard.
Variance is seen while options remain, and a recovery plan follows.
What you get
Work done and manpower on site, every day
Planned against actual, with the look ahead
Work fronts, labour, material and permits needed
Progress, variance and change tracking
Every action with an owner and a date
One view of progress for your PMO
When
Progress report from site
Progress report, look ahead and review meeting
Variance and changes, with HSE and quality reports
A team of 30 in planning, scheduling and project controls.
Zero incidents and zero defects are project objectives, held by teams that are on every site every day.
Site HSE plan, quality plan and inspection and test plans approved before work starts.
QA/QC writes the method statement and HSE adds the risk assessment.
Every worker inducted; a toolbox talk at the start of every shift.
A permit for every high risk task and an inspection at every hold point.
Daily HSE inspection, audits every two months, and every NCR closed.
How it is held
No work front opens without an HSE person present. Every worker has a medical examination and an induction before entry, and incidents are reported at once.
Site QC engineers report to the Head of Quality at head office, not to the site they inspect. Work starts only after the quality plan and test plans are approved.
What you get
Method of working
27 controlled methods connect Operations & Maintenance design intent to work sequence, inspection, testing and handover.
Review the full method indexSite Earthworks and Substructure
Inspection Repair and Handover
Integrated Systems Testing
Controls and Automation
Controls and Automation
Controls and Automation
Start a conversation