Skip to content
Unique Engineers.

HVAC

Process Cooling.

Cleanroom HVAC (ISO 6/7/8), process cooling water, pressure cascade and HEPA-filtered air for semiconductor, pharma and laboratory environments.

Systems & scope

What this covers.

Cleanroom HVAC (ISO 6/7/8)

HEPA-filtered AHUs with laminar-airflow ducting, pressure cascade between zones (≥15 Pa typical for ISO 6), tight T/RH stability (±1 °C, ±5% RH), HEPA H13/H14 gel-seal terminal filtration with in-situ leak testing.

Fan filter units (FFUs)

Ceiling-grid FFUs for unidirectional or semi-directional flow in ISO 6/7 zones. Low-turbulence supply with terminal HEPA H13/H14 gel-seal filtration. 13,656 FFUs installed at SAEL alone.

Process cooling water (PCW)

Closed-loop process-water headers with SS 316 / PP-H piping, primary-secondary interfaces, plate heat exchanger to building CHW. Conductivity and leak taps. OEM-validated hookups. Hydro + pneumatic testing.

Pressure cascade & airflow strategy

Deliberate pressure cascade between zones with door-interlock logic, emergency purge paths, and cross-contamination modelling. Controlled return-air architecture with low-level returns for particle sweep-out.

CDA, nitrogen & vacuum

Compressed dry air, nitrogen and vacuum distribution networks routed with strict slope control, leak-tested to stringent standards, integrated without compromising the contamination zone. Delivered for Foxconn cleanroom and Tata Dholera utility piping.

Pharma & lab process cooling

USP / EP-grade water systems, controlled-temperature process loops, dehumidification and reheat for tight RH-tolerant manufacturing — cosmetics, pharmaceutical, lens and animal-biotech facilities, including NIAB Hyderabad.

Engineering approach

Cleanroom design follows a deliberate workflow: concept zoning by ISO class and pressure strategy; room-by-room heat-load with tool dissipation per OEM datasheet; FFU and HEPA banding; pressure cascade with door-interlock logic; federated BIM at LOD 400 with all clashes resolved before shop release. Validation tests particle count, recovery time, ACPH, ΔP, T/RH, noise and lighting against ISO 14644-3 test methods.

Process cooling water (PCW) is a separate, closed-loop system with SS 316 / PP-H piping, hydro and pneumatic testing, conductivity and leak taps, and OEM-validated hookups. Primary-secondary distribution with plate heat exchangers isolates the process loop from the building's chilled-water plant. Delivered for Foxconn India and the JSW EV battery-line cleanroom.

In delivery

Related project experience.

Semiconductor/ Manufacturing · ₹650 Cr

Foxconn | Apple Manufacturing Campus

Bangalore, Karnataka

View case study
Solar Cell Manufacturing · ₹300 Cr

SAEL Solar Cell Manufacturing

Jewar, NCR

View case study
EV Manufacturing · ₹103 Cr

JSW EV Manufacturing Facility

Chh.Shambhaji Nagar, Maharashtra

View case study
Back to HVAC

Start a conversation

Let’s discuss your project.

Get in touch