
Firefighting & Safety
Compliance & NOC.
NBC 2016, NFPA 13/72, local fire-authority NOC, Form A — compliance documentation and approval delivered as part of scope.
Systems & scope
What this covers.
Code review & submission
Compliance review against NBC 2016, state fire prevention rules, local municipal code. Plan submission to the local fire authority with full calculation backup.
Witness testing & NOC
Hydraulic flow tests, smoke-detection sensitivity tests, gas-suppression discharge tests — all witnessed by the local fire authority and operator's QA team.
Documentation handover
Full as-built drawings, hydraulic calculations, equipment cut-sheets, maintenance manuals and training records handed over in the operator's required format.
Engineering approach
Code review happens at scheme stage so the building's egress, compartmentation and suppression strategy is set before architectural drawings freeze. Late code-driven changes are the most expensive kind.
Inspections are scheduled and rehearsed. Common failure modes (missing signage, unsealed penetrations, blocked egress) are caught in a pre-inspection walk so the formal inspection is a confirmation, not a discovery.
Start a conversation