
Civil & Interior
Foundations & Structural.
Raft, pile and combined foundations engineered against soil investigation, load take-down and seismic zone.
Systems & scope
What this covers.
Pile foundations
Driven, bored and cast-in-situ piles sized to soil bearing capacity and load take-down. Pile integrity tests on every pour.
Raft & combined footings
Mat foundations for high column-load buildings and combined footings for asymmetric load patterns. Cast in instrumented continuous strips.
Substructure & retaining
Basement walls, retaining structures and shoring for deep excavations. Water-stop detailing at construction joints; sealed against groundwater intrusion.
Engineering approach
Design follows IS 456, IS 875 and IS 1893 with seismic zone-specific detailing. Reinforcement bar-bending schedules are model-derived and reconciled with the architectural and MEP federated model before fabrication, eliminating field surprises.
Pours are pre-mobilised with batching schedule, transit-mixer routing and pump positioning agreed against the structural inspection plan. Concrete cubes are sampled at agreed intervals and tested by NABL-accredited labs.
Start a conversation